ACS, Inc was chosen to provide the testing services for the piles being driven by Dutra for the new bridge connecting Woodward Island to Bacon Island Rd towards Stockton. The bridge goes over the Middle River and replacing an existing ferry. ACS had previously provided Wave Equation Analysis services during the bidding phase of this project.